Initial Load and Scheduling¶
Initial Load¶
The initial load is a critical phase where data is first imported into the MFSQL Connector. This process involves several key steps:
Data Extraction: Identify and extract data from the source systems (e.g., M-Files, ERP systems).
Transformation: Apply necessary transformations to the data to fit the target schema.
Loading: Load the transformed data into the MFSQL Connector.
Scheduling¶
Once the initial load is complete, it’s essential to establish a regular scheduling mechanism for ongoing data synchronization. Consider the following approaches:
Incremental Loads: Only load changed data since the last successful load.
Full Loads: Periodically re-load all data to ensure consistency.
Event-Driven Loads: Trigger loads based on specific events (e.g., file uploads, database changes).
Best Practices¶
Monitor load performance and adjust schedules as needed.
Implement error handling and alerting for failed loads.
Document the data flow and transformation logic for future reference.